• KM 5 East West Road, Rumuodara (Behind Omega House) Port Harcourt
  • +2347065684628
  • info@laser-ng.com
The cart is empty

SLICKLINE SERVICES

WIRELINE / SLICKLINE OPERATIONS ON LAND, SWAMP & OFFSHORE.

Laser Engineering runs Slickline service that goes a long way to improving services and adding value to the Oil and Gas industry. Slickline can be used to acquire data that is utilized for reservoir surveillance, determination of simulation candidates, gas lift optimization, input for reservoir simulation, and material balance calculations. Our slickline operations contribute in setting new standards in the industry with particular reference to bottom-hole pressure test analysis, welltest supervision, and information data.

Our state-of-the-art equipment for this service includes rugged Slimline, Flyline and CS Skid units (k-winch) from ASEP of Holland which are zone 2 complaint. Our memory gauges are reliable and have large memory capacities and produce excellent data quality. The software for analysis and interpretation are from the best world-class software developers.

Services include:

  • BHP
  • SCSSV Retrieval & Installation
  • Well Integrity Test
  • Wax Cutting
  • Well Integrity Test
  • Gaslift Valve Retrieval & Installation
  • Zone Change
  • Swabbing
  • Fishing
  • Plugging & Unplugging
  • Completion
  • Bottom hole Sampling    

                   

PROJECT EXPERIENCE IN SLICKLINE & BHP SERVICES

NAME OF CLIENT

LOCATION OF WORK

DESCRIPTION OF WORK

YEAR

MONIPULO NIG. LTD.

Offshore

Swabbing

November 2009

MILLENIUM OIL & GAS LTD.

Land

BHP Survey

May 2010

DUBRI OIL

Land

BHP Survey

June 2010

PAN OCEAN OIL CORP.

Land

BHP Survey

January 2011

SEPLAT

Land (Oben)

BHP Survey

October 2011

MONIPULO NIG. LTD.

Offshore

Knock Out Isolation Valve break out

September 2011

MONIPULO NIG. LTD.

Offshore

Swabbing

October 2011

MONIPULO NIG. LTD.

Offshore

BHP Survey

November 2011

WALTERSMITH PETROMAN NIG. LTD.

Land (Ibigwe)

Completions

April 2012

SEPLAT

Land (Oben)

BHP Survey

April 2012

ENERGIA LTD.

Land (Ebendo)

Completions

August 2012

NPDC – OML 26

Land (Ogini)

Well Testing / BHP Survey

Dec. 2012 – April 2013

SEPLAT

Land (Oben)

BHP Survey

October – November 2013

EXXONMOBIL

Offshore

Gas Lift valve retrieval/Installation, Insert valve Installation, Plugging, Zone Change, Sand bailing, BHP Survey, etc.

September 2014 – May 2015

XENOIL ENERGY RESOURCES LTD.

Swamp(KE-1)

BHP Survey

April 2015

ENERGIA LTD.

Land (Ebendo)

BHP Survey

November – December 2015

NECONDE ENERGY LTD.

Swamp (Odidi)

Upfront Slickline and CO Logging campaign

February – March 2016

SEPLAT

Land (Sapele, Orogho, Okpohuru, Oben, Amukpe)

Plugging, BHP Survey

May – June 2016

SEPLAT

Land (Sapele)

BHP survey

November 2016

LEKOIL OIL & GAS INVESTMENT LTD.

Land (Otakikpo)

Bottom Hole Sampling

December 2016

FRONTIER OIL LIMITED

Land (Uquo)

BHP Survey

February 2017

XENOIL ENERGY RESOURCES LTD.

Swamp(KE-1)

Production Logging & Well test

April – May 2017

ENERGIA LTD.

Land (Ebendo)

BHP Survey

May 2017

LEKOIL OIL & GAS INVESTMENT LTD.

Land (Otakikpo)

BHP Survey

May 2017

LEKOIL OIL & GAS INVESTMENT LTD.

Land (Otakikpo)

BHP Survey

June - July 2017

FRONTIER OIL LIMITED

Land (Uquo)

Sand Bailing & BHP survey

July 2017

FRONTIER OIL LIMITED

Land (Uquo)

Bottom hole Sampling

July 2017

LEKOIL OIL & GAS INVESTMENT LTD.

Land (Otakikpo)

BHP Survey

August 2017

ENERGIA LTD.

Land (Ebendo)

BHP Survey

October – November  2017

DUBRI OIL

Land (GilliGilli)

BHP Survey

December 2017

EROTON E & P

Swamp (Caw Thorne Channel)

Fishing

December 2017

EROTON E & P

Swamp (Caw Thorne Channel)

Completions / Swabbing

February – March 2018

EROTON E & P

Swamp (Caw Thorne Channel)

Cement Packer

March 2018

ELCREST

Swamp (Opuoma)

Bottom Hole Sampling

March 2018

NPDC

Land (Egbema)

Bottom Hole Sampling

April 2018

NPDC JV FHN & SNL

Land (Ogini)

Gas lift Valve Installation and Retrieval

June 2018

EXXONMOBIL

Offshore (Rig Trident 14)

Gas lift Valve Installation and Retrieval, Leak detection, Plugging/un-plugging, etc.

July 2018 till date

EROTON E & P

Swamp (Caw Thorne Channel)

Dummy Valves Installation and Retrieval

June 2018 till date

NEW CROSS

Swamp (Ekulama)

Bottom Hole Sampling

September 2018

 

NOV Elmar Flyline Winch

Flyline winches are the solution in situations where critical requirements such as access, footprint or weight are a key factor in winch selection. For example, if urgency of the situation justifies heli transport or a fast boat, or if space or access are too restricted for a container-format winch. The Flyline is a lightweight, compact dual-lift wireline winch unit, suitable for rapid deployment onshore and offshore in temperate and tropical climates.

Features/Benefits of our Flyline Unit

  • Fully certified frame meet the most stringent certification standards
  • Dual-lift for ease of transport
  • Ultra-lightweight for fast heli-deployment
  • Open operator station on winch module for visibility and light weight
  • Powerful water-cooled four cylinder diesel engine delivering up to 54 kW (72 HP)
  • Smallest footprint in a winch of this capacity: small, but powerful!
  • Power pack designed to run quietly non-stop
  • Reliable NOV Elmar patented closed loop hydraulic system for trouble-free operation
  • Unique hydraulic transmission for stable winch speed and maximum control
  • Weight and format ideal for offshore operations
  • Fitted with drainage drip tray to eliminate environment impact and spillage from well fluids and lubricants
  • Optional ATEX certification available to meet European sector requirements
  • Extensive customising options, because every customer has different needs
  • Double Drum
  • Auxillary Drive
  • Jacking Wheels
  • SmartMonitor 12”

Power Pack

  • Engine: four cylinder diesel engine providing 54 kW (72 HP) @ 2,400 rpm
  • Starter system: spring / hydraulic / air
  • Electrical rig supply: 115 VAC 60 Hz / 230 VAC 50 Hz
  • Diesel reservoir: 108 Litres, 28 US Gallon
  • Engine controls: Start and stop / Hour counter / Monitoring and safety system

Control Panel

  • Hydraulic main pressure gauge
  • Line tension valve
  • Winch direction and speed control valve
  • Brake control
  • Emergency stop button
  • Horn

MEMORY GAUGE & ACCESSORIES

BENEFITS & USES

Fast/quick response to pressure & temperature change

Zero maintenance

Quartz-Crystal

Piezo-resistive sensor/strain Gauge

Data set content (Pressure, Temperature, Time)

Large memory capacity (≥500,000 data sets)

Multi Sample program segment
Sample interval (1 second – 1 hour)
Unique small size (Single 10.3”, tandem 19.2”)

BOTTOM HOLE SAMPLING SERVICE

For capturing fluid samples from the reservoir for PVT analysis. Run on slickline and fired by mechanical clocks.

FEATURES OF SINGLE PHASE BOTTOM HOLE SAMPLER

  • Provide a high quality representative Bottom Hole Sample
  • Maintain Sample in Single Phase (Using Nitrogen)
  • Suitable for sour service, H2S, Co2 and High GOR wells
  • Fast redress ability
  • Ability to validate sample in sample chamber and ship to lab without transfer

Transfer of sample into a pressurized cylinder using the Micro Field Transfer Bench (MFTB) during field operation

 MEMORY PRODUCTION LOGGING

Production Logging is a field operation activity that is carried out in a producing well in the attempt to quantitatively access the flow and phase behaviour of the production.

Whenever the word “Production Logging” is mentioned the usual acronyms that come to mind are PLT or MPLT which stands for “Production Logging Tool” or “Memory Production Logging Tool”. PLT is run with E-Line which data can be assessed instantaneously on surface whereas MPLT is run with a slickline unit and data acquired is stored in a memory chip inside the tool.

Currently we can provide cased hole logging services using our state-of-the-arts slickline units.